After creating a migration task, you can view the task information and perform subsequent operations on the task details page at any time.
The migration details include:
- Basic Settings: task name, task status, and task description
- Source Information: type, protocol, endpoint, path, and migration method
- Destination Information: type, protocol, endpoint, and path
- Advanced Options: maximum number of concurrent subtasks, overwriting policy, server-side encryption, and metadata migration policy
- Filter Options: included and excluded patterns, path, and time range
- Migration Results: total number of completed files, number of files that are successfully migrated, number of files that fail to be migrated, number of files that are skipped during migration, and migration completion rate
- Rate Limiting: rate limit time range and rate limit
- Traffic Statistics:statistics in last 1 hour, last 6 hours, last 24 hours, and the entire migration period
Procedure
- Double-click the RDA icon on the desktop or RDA.exe in the installation directory to start the RDA client. Enter the username and password to log in to the RDA console.
- In the navigation pane on the left, choose Migration > Storage Migration.
- On the Storage Migration page, click the task name to go to the task details page.
Follow-Up Operations
You can perform the following operations on the task details page.
Operation
|
Description
|
Editing a task
|
- For a task that is not in a Succeeded state, you can change the setting of Max. Concurrent Subtasks in Advanced Options.
- For a task in a Failed or Error state, you can modify the overwrite policy in Advanced Options.
|
Viewing report paths
|
In the Migration Results pane on the task details page, you can view the number of files that are successfully migrated, fail to be migrated, or are skipped in the task. You can view the paths where the lists of migrated, failed, and skipped files are stored by hovering over .
|